4.2 MWh
delivered in real operations
Traction
The validation already exists. The next step is to deploy, activate zones and generate recurring revenue.

4.2 MWh
delivered in real operations
36 min
per service
-20%
OPEX in measured fleets
2×
fixed charger utilization
Current validation
Not a lab environment. Real operations with continuous system learning.
+4,200 kWh delivered in real operations
36 minutes per service
-20% OPEX in measured fleets
2× fixed charger utilization
Continuous operations validated in the field
Next phase
The next stage is to turn validation into operational and commercial expansion.
